Skip to content
Solar · Adams County, WI

Solar installers in Adams County

12 companies have installed solar on 35 homes here since 2023. Covers Rome, New Chester, Adams, Dell Prairie, Preston, Springville and nearby towns.

Median installed price in Adams County$2.73/WAbout $15,000 for a 5.5 kW system, before incentives (Wisconsin: $3.92/W)
InstallerHomes since 2023Median price in state
Ethos Green Power10$2.68/W$1.24 below median
Olson Solar Energy7$3.15/W$0.77 below median
All Energy Solar4$3.73/W$0.19 below median
North Wind Renewable Energy4$3.70/W$0.22 below median
All Sky Energy2$2.81/W$1.11 below median
Sol Energy New Mexico2$5.50/W$1.58 above median
Drews Solar1$2.63/W$1.29 below median
Glow Solar1$2.91/W$1.01 below median
LTL Led1$3.92/W
Midwest Solar Power1$2.88/W$1.04 below median
Skyline SolarBased in Hamilton, NJ · (732) 354-31111—
Traditions 12910061$5.13/W$1.21 above median

Ranked by homes installed, which shows who’s active here, not who’s best. Prices are each company’s median for systems sold outright, shown when it sold at least 10.

Towns in Adams County: Rome, New Chester, Adams, Dell Prairie, Preston, Springville, Quincy, Strongs Prairie, Jackson, Big Flats, New Haven, Friendship.

How much does solar cost in Adams County, WI?

Homes in Adams County that bought solar in 2023–2025 paid a median $2.73/W installed, about $15,000 for a 5.5 kW system before incentives.

Which solar companies install in Adams County, WI?

12 installers have put in home systems in Adams County since 2023, the busiest being Ethos Green Power, Olson Solar Energy, All Energy Solar, North Wind Renewable Energy, All Sky Energy.

Installed prices and installers from public installation records: Lawrence Berkeley National Laboratory’s Tracking the Sun (systems installed through 2025) and state program files from California, New York, New Jersey, Connecticut, Illinois and Oregon, which run into 2026. Prices are in dollars per watt of panel capacity (DC), before rebates and tax credits, for homes that bought their system; leased systems and systems with batteries are left out.