Solar installer
Turn Key Construction
Based at Fresno, CA 93720. Installed solar on 279 homes since 2023 in California. Installing since 2014. Latest install on record: August 2026.
- Homes since 2023
- 279
- Median price
- $3.29/W
- Typical system
- 8.8 kW
- Leased or PPA
- 0%
Price
Homes that bought their system from Turn Key Construction paid a median $3.29/W installed, and the middle half paid $2.98/W–$3.77/W (140 systems since 2023, before incentives). That's $0.78 a watt below the California median of $4.07/W.
5% of its recent systems included a battery.
Where it installs
Counties with homes it installed since 2023, busiest first.
Fresno County, CA · 174El Dorado County, CA · 37Tulare County, CA · 23Madera County, CA · 9Kings County, CA · 5San Diego County, CA · 5Contra Costa County, CA · 2Kern County, CA · 2Los Angeles County, CA · 2Merced County, CA · 2Monterey County, CA · 2Napa County, CA · 2Orange County, CA · 2Santa Clara County, CA · 2Sonoma County, CA · 2Marin County, CA · 1Mariposa County, CA · 1Placer County, CA · 1San Benito County, CA · 1San Bernardino County, CA · 1San Luis Obispo County, CA · 1San Mateo County, CA · 1Solano County, CA · 1