Solar installer
Graham Porter Construction
Based at Merced, CA 95341. Installed solar on 3 homes since 2023 in California. Installing since 2011. Latest install on record: October 2024.
- Homes since 2023
- 3
- Median price
- —
- Typical system
- 5.6 kW
- Leased or PPA
- —
Price
Public records don’t show enough systems bought outright from Graham Porter Construction (at least 10) for a price. Ask for a quote in dollars per watt to compare it with the California median.
Where it installs
Counties with homes it installed since 2023, busiest first.