Skip to content
Solar · Inyo County, CA

Solar installers in Inyo County

6 companies have installed solar on 21 homes here since 2023. Covers Bishop, Big Pine, Cartago, Charleston View, Darwin, Dixon Lane-MeadowCreek and nearby towns.

Median installed price in California$4.07/WAbout $24,400 for a 6 kW system, before incentives
InstallerHomes since 2023Median price in state
Berger Electric And SolarBased in Bishop, CA · (760) 914-05649$5.20/W$1.13 above median
Solarsun ConstructionBased in Lake Elsinore, CA · (909) 556-83646$5.18/W$1.11 above median
High Point SolarBased in Mammoth Lakes, CA · (760) 937-58492$4.30/W$0.23 above median
LGCY ElectricBased in Lehi, UT · (855) 353-48992$6.40/W$2.33 above median
Mec ElectricBased in Tollhouse, CA · (925) 212-80941—
Titan SolarBased in Mesa, AZ · (855) 729-76521$5.28/W$1.21 above median

Ranked by homes installed, which shows who’s active here, not who’s best. Prices are each company’s median for systems sold outright, shown when it sold at least 10.

Towns in Inyo County: Bishop, Big Pine, Cartago, Charleston View, Darwin, Dixon Lane-MeadowCreek, Furnace Creek, Homewood Canyon, Independence, Keeler, Lone Pine, Mesa.

How much does solar cost in Inyo County, CA?

There weren't enough Inyo County systems bought outright for a county figure. Across California, homes paid a median $4.07/W installed in 2023–2025, about $24,400 for a 6 kW system.

Which solar companies install in Inyo County, CA?

6 installers have put in home systems in Inyo County since 2023, the busiest being Berger Electric And Solar, Solarsun Construction, High Point Solar, LGCY Electric, Mec Electric.

Installed prices and installers from public installation records: Lawrence Berkeley National Laboratory’s Tracking the Sun (systems installed through 2025) and state program files from California, New York, New Jersey, Connecticut, Illinois and Oregon, which run into 2026. Prices are in dollars per watt of panel capacity (DC), before rebates and tax credits, for homes that bought their system; leased systems and systems with batteries are left out.